Skip to content
K R JPainting Services

Specialist Surfaces

Intumescent steel painting at specified film depths

Airless application at 3,000 psi. Coating build measured. Compatible primers and finishes considered.

01908 538149

Structural steel prepared and airlessly coated to the specified intumescent film build, with thickness checks.

Fire protection is more than a coat of paint

Intumescent paint is a reactive coating. Under heat, it expands to form an insulating carbon layer that slows heat transfer into the structural steel beneath. That performance depends on the specified system and coating depth, so we do not treat the work like ordinary decorative painting. We first assess the steel sections, existing coating, access and required fire performance. Preparation and compatible primers are established before the intumescent material is applied.

Using airless equipment operating at 3,000 psi, we build the coating across beams, columns and other structural members while paying attention to edges, connections and changes in section.

Measured application across each steel section

Different steel sizes can require different coating builds, and an apparently even finish does not prove the required depth has been reached. We apply the material in controlled stages and measure film build across the relevant sections. Environmental conditions, access and the shape of the steel all affect how the programme is sequenced. Where the chosen system needs a finishing coat, that is considered alongside primer compatibility and the intended appearance.

Our survey and quotation need the fire requirement and available specification, not just the floor area. That allows preparation, coating quantities and inspection points to be planned around the structural steel actually present.

Workforce credentials

Industrial coating and construction site competency training held by operatives working on structural steel.

  • ICATS
  • CSCS

Controlled coating where performance matters

01

Specification checked first

We review steel size, required fire performance and existing coating condition.

02

Film build measured

Thickness checks confirm coating build rather than relying on appearance alone.

03

Steel details covered

We plan application around connections, edges and changing section shapes.

FAQs

Project questions

Next step

Discuss your steel fire-coating specification

Call us with the steel schedule, fire requirement and access details so we can assess the proposed work.

01908 538149